Wednesday, September 17, 2008

dome day! group 19 assembled!

according to the assignment that cik wan have given us before.. im recalling about the production elements that he wanted for this project..

Intention : experiential, holistic, simulative learning
Actor : The group members! 5 of us-- aufa, firuzabadi, shaumi, idham and hafiz
Act : design, build, assemble and blog out the processes
Site : HBP premise
Rule :

  • zero cost -- wee!! we managed that!
  • prefabricated -- not a problem at all
  • packaged -- yes
  • accommodate 5 -- it can even fit up to 6 people!
  • carryable -- we can carry it
  • assembled in 30 minutes-- before 12pm.. we're done!
  • only by team members
  • show team identity -- green to nature and transparent resembles glass to our dome.. so kitorg mmg best!
  • life : 12 months
  • recyclable-- the bamboo can be used to make a raft, floor, and construct any object.. the pvc fabric can be turned into banner and table cloth
product : the dome!

before we start to get our dome to the proposed site.. cik wan have made a change to the site where all the site numbers that he linked it out at his website merely changed.. but we're group 19! it doesn't make any difference.. our site is still at the middle of the premise..


the site before it was changed

the changes of the site

apparently there are still some students that couldnt get into any team or they couldnt create one.. so this group of students were named the black widow team.. too bad for them and hopefully they could do the assignment given.. all the best folks!


as we left the shaped bamboos in the studio, we went back to get it and build it to the desire dome.. we stopped for photography session! idham is a camera freak so he loved it dearly!


snap!! we stopped for a rest

all of us inside our dome~ i've told ya we can fit into it

adjusting a few things before moving on to our site

inside the dome after we wrapped it with the pvc.. green and transparent! kitorang memang best!

we're inside the dome! it was raining and we are shading under it.. it was useful!

the look of the dome! finally.. we finished building it up! we even have visitors interested with our dome.. heheh

we were so exhausted! although it was fasting month we still had the energy to get through the rest of the day! i surely will never forget this experience! from struts (object) we connect them together the dome-like-a-building with a few finishes for the interior and exterior on the HBP premise, inside the urban of USM-- regional of Minden! everything must have its steps from small scale into bigger ones to get the product! it is the elements of production! voila!



1 comments:

EP_JB said...

very aesthetic design